Anxing material handling and compact machinery in an industrial work setting

ANXING MACHINERY China Forklift Manufaturer

Forklifts, stackers, mini excavators and scissor lifts matched to your application, working conditions and destination.

Explore Products

Forklifts, Stackers and Compact Equipment

View All Products
Order-Scope ReviewModel, configuration and required records are checked against the confirmed order.
Shipment CoordinationPacking, labels, destination and available shipment records are reviewed before dispatch.
Application ComparisonCompare the load, working range, route, surface and daily duty before choosing a model.

FACTORY PRODUCED

About Us

Over the past 16 years, we have been focusing on research and development and serving customers with our hearts. Until now, we have had some success, but we still keep our original intention and continue to work hard.

ANXING has passed ISO9001 quality management system certification and EU CE certification, and has established in-depth industry-university-research cooperation relationships with Harbin Institute of Technology, Wuhan University of Technology, Dalian University of Technology and other institutions over the years. The company is adhering to the path of independent innovation. It has obtained more than 10 invention patents and more than 20 utility model patents.

What We Check Before Shipment

The finished machine is compared with the approved order before packing. Inspection items follow the confirmed model and configuration, while document requirements are checked by model and destination.

  1. Anxing team reviewing machinery application requirements
    STEP 01

    Production Specification Confirmed

    The model, rated capacity, mast or working height, fork dimensions, tire type, battery or engine, and agreed attachments are recorded before production.

  2. Machinery configuration and order details being checked
    STEP 02

    Installed Configuration Checked

    The finished machine is checked against the order, including its mast or platform, forks, tires, power system and attachments.

  3. Anxing machinery inspection and function check
    STEP 03

    Nameplate, Documents & Appearance

    The nameplate and exterior condition are checked. Manuals and other agreed documents are collected according to the model and destination.

  4. Machinery packing and shipment preparation
    STEP 04

    Packing List & Loading Details

    Attachments, separately packed items and supplied documents are matched to the packing list before packing marks and loading details are finalized.

View Production & Inspection

CERTIFICATION, INSPECTION & ORDER DOCUMENTS

Confirm Compliance Requirements Before Production

Tell us where the equipment will be used and which documents your project requires. Anxing can check the requirements with you and coordinate the applicable certification, inspection and supporting documents for the selected model. Availability and procedures vary by machine, configuration, engine and destination market.

CE Requirements

For equipment intended for the EU or EEA, we can discuss the applicable CE requirements and coordinate the declaration, instructions, machine marking and other supporting documents for the confirmed model and configuration.

ISO 9001 Quality Management

Anxing can provide the relevant ISO 9001 certificate for customer review, including the certificate holder, certified scope, issuing body and validity period.

Third-Party Inspection

If independent inspection is required, we can coordinate with SGS or another inspection provider agreed with the customer. The inspection scope, timing and acceptance criteria should be confirmed before the order enters production.

U.S. EPA Engine Requirements

For nonroad diesel equipment intended for the United States, we can discuss a suitable engine configuration and coordinate verification of the emission label, engine family, model year and applicable EPA documentation before production.

Compare Capacity, Working Range and Site Conditions

Frequently Asked Questions

What details do you need to recommend a suitable machine?

Tell us what the machine will handle, the maximum load weight and dimensions, required lift or working height, aisle or doorway width, ground conditions, daily operating hours, order quantity and destination country.

If you already have requirements for the battery, engine, tires, mast, forks, attachments, cabin, certification, branding or packing, include them in your inquiry.

Should I choose an electric or diesel forklift?

Choose an electric forklift for indoor use, frequent starts and stops, lower operating noise, and sites with suitable charging facilities.

A diesel forklift is generally better suited to outdoor work, longer shifts and applications where charging is inconvenient.

We also consider load capacity, travel distance, gradients, ventilation, local climate and emission requirements before recommending a power type.

When do I need a rough-terrain forklift?

A rough-terrain forklift is designed for construction sites, farms, gravel yards and other outdoor locations where the surface is uneven or unpaved.

Send us photos or videos of the site together with the load, gradients, travel distance and weather conditions. We can then review the required traction, tires, ground clearance and capacity.

Should I buy a forklift or an electric stacker?

A forklift is usually the better choice for longer travel distances, frequent loading and unloading, higher operating intensity and work across different areas of a site.

An electric stacker is often suitable for pallet stacking over shorter distances in warehouses with controlled floors and limited working space.

The correct choice depends on the pallet type, load weight, lift height, aisle width, travel distance and expected daily workload.

What OEM and ODM options does Anxing offer?

Depending on the model and order quantity, Anxing can manufacture equipment with specified colors, logos, decals, labels, manuals, packing marks and selected configuration changes.

For requests involving structural changes or new functions, our team reviews the technical requirements, development work, minimum order quantity and lead time before confirming the project.

How is the equipment prepared for export?

Before shipment, we confirm the packing method, separately packed attachments, shipping marks, destination information and loading requirements against the order.

Available export and compliance documents depend on the machine, configuration and destination market, so document requirements should be confirmed before production.

Still comparing models? Send Us Your Requirements →

REQUEST A MODEL RECOMMENDATION

Send Us Your Equipment Requirements

Tell us the work to be done, required capacity or working range, available space, floor or terrain conditions, daily operating hours, quantity and destination. Include any preferred power system, attachment or certification requirement.

GET PRICE & CONFIGURATION